Factory workshop required: lean production floor management on site
(3) delivery time:
One of the main work of administrators
(4) the actual job content should be hold
The rationality of the production plan, production planning and practical difficulties, the influence of the adjustment plan
Staff, staff skills, lack of material production caused by equipment failure, measures and handling non-conforming
Whether parts/tooling/fixture/production materials is complete, the production is normal, can improve the work method
(5) the scene of the basic method
Insight into a line, information flow, production capacity, pay attention to employee status, time/motion study
(6) the scene of the matters needing attention
Exception handling of institutionalization, the scene education, interpretation, clear job responsibilities, fair evaluation staff